Blowing railroad bridges - Printable Version +- Forums (https://www.theblitz.club/message_boards) +-- Forum: The Firing Line (https://www.theblitz.club/message_boards/forumdisplay.php?fid=1) +--- Forum: Tiller Operational Campaigns (https://www.theblitz.club/message_boards/forumdisplay.php?fid=11) +--- Thread: Blowing railroad bridges (/showthread.php?tid=74910) |
Blowing railroad bridges - tobruck41 - 09-26-2021 Just a quick question. If you are playing the JTS Panzer campaigns, such as France 40 Gold, and your opponent blows a rail line bridge that you want to use, if your engineers put up a bridge over that hex, will it still serve as a valid rail line that you can transport RR loaded troops over it? Thanks! RE: Blowing railroad bridges - Liebchen - 09-26-2021 (09-26-2021, 04:59 AM)tobruck41 Wrote: Just a quick question. If you are playing the JTS Panzer campaigns, such as France 40 Gold, and your opponent blows a rail line bridge that you want to use, Nope. Engineers cannot build rail bridges, only "heavy" bridges. RE: Blowing railroad bridges - ComradeP - 09-26-2021 Provided that a certain side has a rail capacity, troops can switch from Rail to Travel-mode, move to the other side of the river across the bridge and switch back to Rail mode in a non-damaged rail hex. RE: Blowing railroad bridges - tobruck41 - 09-28-2021 (09-26-2021, 11:00 PM)ComradeP Wrote: Provided that a certain side has a rail capacity, troops can switch from Rail to Travel-mode, move to the other side of the river across the bridge and switch back to Rail mode in a non-damaged rail hex. |