• Blitz Shadow Player
  • Caius
  • redboot
  • Rules
  • Chain of Command
  • Members
  • Supported Ladders & Games
  • Downloads


Bridge work
03-31-2007, 09:46 AM, (This post was last modified: 12-05-2007, 05:37 PM by PoorOldSpike.)
#1
Bridge work
[Image: CMbridges.jpg]

BLOWING BRIDGES TEST RESULTS
(Note CM's inbuilt randomness means figures may vary slightly from game to game)

TEST 1 - HEAVY BRIDGE��(high pointed arch graphics)
150mm shells from Hummels/ Brummbars/ Grilles = 128 shells needed��to drop bridge
75mm shells from PzIVH's = 522 shells to drop bridge
Pioneer demo charges = 66 charges to drop bridge

TEST 2 - MEDIUM BRIDGE��(gentle low arch graphics)
150mm = 5 shells needed
75mm = 22 shells needed
Demos = 3 charges needed

TEST 3 - LIGHT BRIDGE��(Trestle graphics)
150mm = 3 shells needed
75mm = 13 shells needed
Demos = 2 charges needed

Note:- Don't spread the shells/charges along the length of the bridge or it'll take more to drop it, so concentrate on one spot.
Note:-Don't shoot at the road at the ends of the bridge even though the targetting cursor says "bridge" or it'll��take longer to drop; so target the dark grey bridge surface itself. And it doesn't matter whether you target a spot above an arch or not, it's no tougher or weaker there.
Note:- You can monitor the "damage asterisks" at the end of each turn via the "look" cursor to see how you're doing; 1 asterisk means light damage, 2 asts mean medium damage, 3 mean about to drop.
Note:- When throwing demo charges, 30metres is max range, watch for "use explosives" confirmation��message when targetting.
Note:- Flamethrowers have no effect against bridges,not even the light bridge.

PS - Grenade bundles can also blow bridges, a medium will require about 9 bundles to drop it (see test pics elsewhere in this stunning thread), and a light bridge will need much less, but forget about trying to drop a heavy with bundles, you'd need dozens.
Quote this message in a reply


Messages In This Thread
Bridge work - by PoorOldSpike - 03-31-2007, 09:46 AM
RE: Bridge work - by PoorOldSpike - 04-01-2007, 09:05 AM
RE: Bridge work - by Der Kuenstler - 12-14-2007, 12:46 AM
RE: Bridge work - by Copper - 04-01-2007, 10:01 AM
RE: Bridge work - by RNL Tiger - 12-13-2007, 07:04 PM
RE: Bridge work - by PoorOldSpike - 04-01-2007, 10:05 AM
RE: Bridge work - by PoorOldSpike - 07-29-2007, 12:17 PM
RE: Bridge work - by RNL Tiger - 12-13-2007, 07:03 PM
RE: Bridge work - by PoorOldSpike - 12-13-2007, 09:58 PM
RE: Bridge work - by RNL Tiger - 12-16-2007, 02:43 AM
RE: Bridge work - by RNL Tiger - 12-17-2007, 01:33 AM
RE: Bridge work - by PoorOldSpike - 12-27-2007, 04:29 PM
RE: Bridge work - by PoorOldSpike - 12-27-2007, 04:38 PM
RE: Bridge work - by bluehand - 12-27-2007, 07:20 PM
RE: Bridge work - by RNL Tiger - 12-27-2007, 10:38 PM
RE: Bridge work - by PoorOldSpike - 12-28-2007, 06:30 AM
RE: Bridge work - by Der Kuenstler - 12-29-2007, 12:54 AM
RE: Bridge work - by PoorOldSpike - 03-28-2008, 10:02 AM
RE: Bridge work - by PoorOldSpike - 06-28-2008, 05:13 PM

Forum Jump:


Users browsing this thread: 3 Guest(s)