RE: My thoughts on the H2H and CS.
Another problem is that H2H approved scenarios are stored in a separate table. This means that, as opposed to scenarios in the "normal" database, the designer can't change them anymore after they've been approved. Any scenarios I made through H2H and that are in the approved area are now totally outdated and replaced by new ones that came with the Matrix package.
I agree with Foul that if the designer puts in some energy the scenarios can move through H2H relatively fast. On the other hand I also agree with Ed, that this testing tells the designer very little. One might as well put a scenario in the database straight away and make modifications later based on results and comments as they come in.
/H
|