Bridges and bridges
What is the best way for one bridge engineer unit (with a bridge already constructed) to hand over the bridge to a different engineer unit?
Is the first engineer unit required to disassemble their bridge first so that the second one can assemble theirs, or can it be done in some other way?
Bridge engineers are so unpredictable. Dogs are easier to command than these unruly bastards, it seems they just sit around doing nothing!
:hissy:
"I sincerely believe the banking institutions having the issuing power of money are more dangerous to liberty than standing armies." - Thomas Jefferson, letter to James Monroe, January 1, 1815.
|