33vortex Wrote:What is the best way for one bridge engineer unit (with a bridge already constructed) to hand over the bridge to a different engineer unit?
Is the first engineer unit required to disassemble their bridge first so that the second one can assemble theirs, or can it be done in some other way?
Bridge engineers are so unpredictable. Dogs are easier to command than these unruly bastards, it seems they just sit around doing nothing!
:hissy:
Well you can't "hand over" an existing bridge to another Eng unit, the new unit would indeed have to build their bridge and the original unit dismantle theirs and as you say unless you wait for the second (new)bridge to be completed you will have no idea how long each action might take and there may be a period with no bridge in place, so be careful! :eek1: