RE: Bridge building: Panzer Campaigns
Engineers attacked while building bridges tend to take longer to complete them or in the extreme case, they dont get the bridge done at all. If they are disrupted their struggles to get bridges across increase.
Units may pass through the engineer and across bridges but must be in T Mode to cross. The engineer can later abandon a bridge and move on to other duties but I believe they would no longer be capable of bridge building.
Hope this helps
However beautiful the strategy, you should occasionally look at the results. Winston Churchill
|