(04-02-2015, 08:36 PM)Amadeus Wrote: (03-31-2015, 07:23 AM)Volcano Man Wrote: I have since discovered that a game engine change will be required (in the next title, and will be carried into F14 after that) which limits the rail capacity at certain dates of the campaign. It should be a house rule that neither side EMBARKS units into rail mode before August 27th. On and after that date is fine. This is because rail capacity was essentially occupied fully at the start of the campaign, with mobilization duties.
If the next title will also have to deal with mobilization issues, I hope this means that it will cover Galicia and Serbia.
Perhaps, but rail movement and varied rail availability played a role in all fronts and at all periods of the war.