#421206_01b Clearing Jebel el Guessa [Allied Human] - PzC 20 Tunisia 43
0 - 0 - 0
Rating: | 0 (0) |
Games Played: | 0 |
SM: | 1 |
Turns: | 8 |
Type: | Stock |
First Side: | Axis |
Second Side: | Allies |
S of Tebourba, Dec 6th 1943:
Both sides wanted to resume their offensives but it was the Germans who strick first. They moved part of 10PzD south of the Medjeda river in preparation for an attack along both sides of the river. First of all the Jebel el Guessa had to be cleared as it afforded perfect all round observation of the area. The US 1st Bn. 6th Arm'd Inf., was strung out thinly along the Jebel, supported by the 27th Arm'd Field Arty Bn. It was here, from the north and south east, that the Germans struck preceded by 2 waves of Stukas. Help was sent from the reorganizing CCB and by nightfall all was quiet again, but the all important high ground had been lost, as the infantry had been obliged to withdraw to protect their line of communication. [Size,small]
Designer Note: This scenario has been optimized for Allied Human.