• Blitz Shadow Player
  • Caius
  • redboot
  • Rules
  • Chain of Command
  • Members
  • Supported Ladders & Games
  • Downloads


Bridge-building Bug??
02-03-2010, 05:20 AM,
#1
Bridge-building Bug??
There seems to be a bug with bridge building. If you use regular engineers to first build a light bridge, and then use a specialized bridging engineer to construct a second, vehicular bridge over it in the same hex, the program will not recognize the second bridge. It will persist in thinking only a foot bridge is in place and vehicles will not be able to cross.

I encountered this bug when testing Bart Gauvin's 3rd Pz LCG and then tested it in the Bridge Building bootcamp scenario Jason designed. I ran through it twice, building first a foot bridge and then a vehicle bridge in the same hex. Same result both times.

Put it on the fix-list for 1.05? Or is this old news?

Tim
Quote this message in a reply


Messages In This Thread
Bridge-building Bug?? - by TJD - 02-03-2010, 05:20 AM
RE: Bridge-building Bug?? - by Troll - 02-03-2010, 09:34 AM
RE: Bridge-building Bug?? - by TJD - 02-03-2010, 11:07 PM
RE: Bridge-building Bug?? - by Troll - 02-04-2010, 01:53 AM

Forum Jump:


Users browsing this thread: 3 Guest(s)